Skip to content

Asia

New Gantry System

New Gantry System for Pertamina Panjang Terminal

Pertamina Panjang Terminal, Lampung City, Indonesia was built in 1960.

In 2018, Diamond Key International Group upgraded Panjang Terminal with a New Generation Fuel Terminal solution:
Omega5000
Scada
PLC
1 x MFO single arm loading skid with pump
3 x bottom loading skids with FAME & diesel blending
1 x JetA1 bottom loading skid
1 x 4 stream pipeline transfer skid

Lampung, Sumatra's southern most province is well connected by ferry to Banten, West Java and Jakarta. Panjang Terminal is a strategic fuel supply terminal for Lampung province (pop. 8M+) and railcar supply to Kertapati, Palembang.

DKI's solution, known in Pertamina as New Gantry System (NGS) successfully completed SAT in May 2018. Daily throughput was 4M+ litres per day.

This video illustrates Panjang Terminal's digital transformation journey.

At (minute 2:33) of the video, please watch the key operational improvements highlighted by Pertamina and MIGAS personnel:
on-time road tanker deliveries.
operational safety.
product quality (PQ).
meter accuracy.
Pilferage/fraud reduction.

 

Australia - Head Office

110 Henderson Road
P.o. Box 2813
Rowville, Victoria 3178
📞: +61 3 9730 8888

Malaysia Office

23, Jalan PJU 3/46
Sunway Damansara
47810 Petaling Jaya, Selangor
📞: +60 3  7496 9238

China Office

Room 808, Block D, JiaHua Building
No 9, 3rd Street ShangDi
HaiDian District
Beijing, 100085
📞: +86 10 6297 1803

Thailand Office

140, One Pacific Place
10th Floor, Room 1001
Sukhumvit Road, Klongtoey
Bangkok 10110
📞: +66 2 254 5534