Skip to content

Oceania

Digital Twin

Digital Twin Service to Yarraville terminal.

A big congratulations to Exxonmobil Yarraville for your new diesel loading infrastructure

Compliments to ExxonMobil Australia's engineering team for a nice integration of these new loading arms into an existing Bay.

Diamond Key International Group's was glad to provide our Digital Twin service to Yarraville terminal.

DKI's Technical Services team, based in Melbourne, was commissioned to perform operational analysis of the Yarraville terminal.

The Digital Twin (DT )service was able to identify and quantify the outcome of various improvements. One of the many scenarios we proposed was that the terminal could achieve a 10% reduction in total loading time by adding three diesel bottom loading arms to the Bay 8 of Yarraville's Loading Gantry.

These new diesel arms have now been turned into a reality. Best of all, the benefit is directly passed onto the OilMajor customers, thus giving Yarraville Terminal a real and compelling competitive advantage.

DKI's Data Analytics (DA) leverages our understanding of the fuels distribution supplychain and is tailor built to optimise fuel terminal operations.

With every DKI Digital Twin outcome, we make the downstream fuel distribution more efficient than before.

 

Credit photo: ExxonMobil

 

Picture1-Mar-16-2022-06-22-26-49-AM

Australia - Head Office

110 Henderson Road
P.o. Box 2813
Rowville, Victoria 3178
📞: +61 3 9730 8888

Malaysia Office

23, Jalan PJU 3/46
Sunway Damansara
47810 Petaling Jaya, Selangor
📞: +60 3  7496 9238

China Office

Room 808, Block D, JiaHua Building
No 9, 3rd Street ShangDi
HaiDian District
Beijing, 100085
📞: +86 10 6297 1803

Thailand Office

140, One Pacific Place
10th Floor, Room 1001
Sukhumvit Road, Klongtoey
Bangkok 10110
📞: +66 2 254 5534